Close Menu
    Facebook X (Twitter) Instagram
    Qatar OutlookQatar Outlook
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Qatar OutlookQatar Outlook
    Home » Arctech Inks 1.5GW Solar Tracker Supply Deal for the Biggest Solar Plant in the Middle East
    PR Newswire

    Arctech Inks 1.5GW Solar Tracker Supply Deal for the Biggest Solar Plant in the Middle East

    April 11, 2023
    Share
    Facebook Twitter LinkedIn Pinterest Email

    JEDDAH, Saudi Arabia, April 11, 2023 /PRNewswire/ — Arctech, the world’s leading solar tracking, racking, and BIPV provider has announced it is poised to provide 1.5GW SkyLine II solar tracking solution for ASB project in Saudi Arabia, marking the company’s first solar tracking and racking project in the country and a milestone of its increasing presence in Middle East.

    Arctech SkyLine II

    Located in the Al Shubakh district, Jeddah City, Mecca, Saudi Arabia, the ASB project is the biggest solar plant in construction in the Middle East region serving the purpose of expediting regional energy transition to spell out the “Vision 2030”.

    The KSA government is actively expediting the regional energy transition, as Saudi Arabia is aiming for 50% of its energy to be generated from renewable sources by 2030, which means 27.3GW of renewable energy installation, the Saudi Public Investment Fund has invested around SR1.5 trillion (US$400 billion) since 2016 in alternative energy. Saudi Arabia aims to employ clean technologies and renewable energy to reduce its projected 2030 emissions by more than 130 million tonnes and lessen Saudi Arabia’s contribution to global emissions, which currently account for more than 4% of all planet-wide emissions.

    .Arctech has a series of trackable project portfolios in the region following the “One Belt One Road” initiative including the IBRI II 607MW project in Oman and the 2.1GW Al Dhafra PV2 project in Abu Dhabi among others, the company has established branches in Saudi Arabia and The United Arab Emirates to deepen localization and offer white-glove services to regional clients.

    2.1GW Al Dhafra PV2 Project in Abu Dhabi

    Arctech has a long-term good rapport with ASB project owner ACWA Power and EPC China Energy Engineering Group Co., Ltd. (hereafter “CEEC”). In February, the company welcomed the senior management from ACWA Power and China Energy Engineering Group Co., Ltd. (hereafter “CEEC”) at a business meeting in Arctech’s headquarters, Kunshan, China, during the visit, Mohammad A. Abunayyan, Chairman of ACWA Power remarked: “Arctech and ACWA Power have carried out fruitful cooperation on previous projects, we expect to strengthen cooperation and innovate the cooperation mode with ACWA Power under the Road and Belt Initiative and Saudi Arabia’s Vision 2030, becoming a pair of role models for Belt and Road cooperation.”

    Photo – https://mma.prnewswire.com/media/2051408/Arctech_SkyLine_II.jpg
    Photo – https://mma.prnewswire.com/media/2051409/2_1GW_Al_Dhafra_PV2_Project_in_Abu_Dhabi.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/arctech-inks-1-5gw-solar-tracker-supply-deal-for-the-biggest-solar-plant-in-the-middle-east-301794227.html

    Related Posts

    LG Highlights 5-Year Panel Warranty with OLED Care+ Across 2026 Premium TV Range

    August 5, 2026

    Sinopec Commissions 50,000-Ton Specialty PVA Facility, Creating World’s Largest Single-Site High-End PVA Production Base

    August 5, 2026

    Levoit EverestAir Lands in the UAE: The Summit of Pure Air for Families Battling Year-Round Allergies

    August 5, 2026

    Wison Establishes Abu Dhabi Subsidiary and Opens New Office

    August 5, 2026
    Latest Posts

    Austria sets July heat record amid €1.4 billion losses

    August 3, 2026

    Oil prices swing after Brent tops $90 on supply strains

    August 3, 2026

    Trump cancels Iran strikes pending rapid nuclear deal

    August 3, 2026

    UK solar capacity reaches 22.8 GW before plug-in launch

    August 3, 2026

    DR Congo Ebola outbreak reaches record scale

    August 3, 2026
    © 2026 Qatar Outlook | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.